Case Study

Max-Emitter Outperforms Competition In Peru Gold Mine Test With Only 5% Plugging

A Peruvian gold mine conducted a 60-day leach cycle test of the Max-Emitter and two other leading brands in early 2013. The Max-Emitter had only 5% plugging while competitors saw 30–40% plugging.
Ore-Max system components in the field
Published
March 9, 2026
Topic
Gold Mining

Results

Headline results

Plugging After 60-Day Leach Cycle
Only 5%

About this resource

The case study

A Peruvian gold mine conducted a 60-day leach cycle test of the Max-Emitter and two other leading brands of emitterline in early 2013. At the end of the leach cycle, the Max-Emitter had the best results with only 5% plugging after 60 days while the other brands saw 30% and 40% plugging. The Max-Emitter dramatically outperformed the competition in plug resistance and uniform leach solution distribution resulting in increased ore extraction from the leach pad.

Related

Continue exploring

More from the Ore-Max library — hand-picked to match what you're reading.

After Max-Emitter Conversion, 7 New Monthly Production Records Set — Gold Extraction Increases 26%

26%

After Max-Emitter Conversion, 7 New Monthly Production Records Set — Gold Extraction Increases 26%

Gold Mining

Read Full Story
Max-Emitter Conversion Increases Copper Extraction 18% And Brings Electrowinning Tankhouse To 100% Capacity

18%

Max-Emitter Conversion Increases Copper Extraction 18% And Brings Electrowinning Tankhouse To 100% Capacity

Copper Mining

Read Full Story
Max-Emitter Conversion Results In 10% Gold Extraction Increase At Major U.s. Gold Operation

10%

Max-Emitter Conversion Results In 10% Gold Extraction Increase At Major U.s. Gold Operation

Gold Mining

Read Full Story

Ready to Optimize Your Heap Leach System?

Talk with Ore-Max engineering experts about emitterline selection, hydraulic performance, and system layout strategy.
Explore Systems